Oct 1, 2007 - These pictures are from Sept. 29th but I wanted to get my halloween pages up.. Enjoy! HVAC guys working today too....

Oct 2, 2007 - Dave met with sheet rock guy to get an estimate. HVAC and electrician were there doing stuff too.

Oct 3, 2007 - Sheet rock being installed in storage room.


Mouse and Dark

Oct 4, 2007 - The above picture I submitted at "Glamour Spots" where some of the entry fee goes to animal charities and it made it into the top 10 now I need your help to make it #1 this month. all you need to do is VOTE VOTE VOTE every day for the month of Oct. (Top 3 win a prize of $100, $75 or $50) THANKS everyone!
VOTE HERE - VOTE HERE FOR PIC # 9 - VOTE HERE



Oct 4, 2007 - And as for the house the Electrician and HVAC guys were there and Dave did some sheet rock work.

Oct 5, 2007 - No work was done on house today.



Oct 6, 2007 - Some framing done around the windows and doors and some more siding done on the back of the house.

AND PLEASE DON"T FORGET TO VOTE FOR PIC # 9 WE ARE STILL IN 1ST PLACE BUT...

Oct 7 - 8, 2007 - No work was done on house today.


Oct 9, 2007 - Caulking being done and HVAC guys there putting in more ducts.


Oct 10, 2007 - Some more siding added.


Oct 11, 2007 - Some more siding added. Rest of the railings for porch added. More HVAC stuff installed. Went and checked out some interior doors we are probable going to get "Knotty Pine" and leave them unstained just have them finished.


Oct 12, 2007 - We opted to get some paneling for walls from Southland instead of flooring. It was delivered today. Stairs added to porches, chase being done on fireplace and finishing up some trim.

Truffles made it into our local paper "The Greenville News"
Read article--->Area owners say Persians make friendly, personable pets<--here
Truffles

PLEASE DON"T FORGET TO VOTE FOR PIC # 9


Oct 13, 2007 - Railings put on stairs and some soffit work done. More work done on breezeway. At some point plumber put in spigots. Door put in garage apartment.


samples of what we could use for the fireplace

Oct 15 - 17, 2007 - Only HVAC was being done. Electrician may have done some more. On the 16th Dave and I went to Greenville and checked out a place that does stone work. Today (the 17th) Dave and I went into Greenville to check out where our interior doors will come from and visited with the guy doing the cabinets he gave us a sample of what they will look like, the cabinets AND the interior doors.. Says he will probably start putting a finish on them on Wednesday. Fireplace pictures are examples of what ours may look like..


Oct 19-20, 2007 - Railings put on back porches.

Oct 21-24, 2007 - Nothing was done!

Oct 25, 2007 - More wiring done for electronics.



Oct 26, 2007 - More wiring done for electronics, water heater put in, and some back siding added and more added to chimney.


Oct 27, 2007 - More wiring done for electronics, some back siding added and cat door put in.

Oct 28, 2007 - More wiring done for electronics.

AND PLEASE DON"T FORGET TO --> CLICK HERE TO VOTE FOR PIC # 9 <--
WE ARE STILL IN 1ST PLACE BUT....Still 3 days of voting left!..

Oct 29 - 31, 2007 - Things have been slowing down a bit. Looks like we are to the point of stating on interior.. Framing around upper windows done and wall od back of house finished where cat door is.